企业免费推广平台
慈溪蓝光光电科技有限公司光钎分线箱,ODF箱,光纤配线箱,网络机柜,数字配线架。
137****4611

供应抽拉式光纤配线架 24芯滑轨光纤配线架

收藏 2018-08-30
  • 浙江省宁波市慈溪市
  • 抽拉式配线架;光缆终端盒;出口光纤配线架;
  • 详细信息
  • 4DEA8DD1FA425D3552CB00B4F30E9E42_副本.jpg

    Manual of SC24 /48/96 Optic Fiber Terminal Box

    IApplication
    The product can be used on the terminal of the optical cables, different types and structures, the diameter of which are within 18mm(f) tray.

                  

                                                  

    IIStructural features.

    All property indexes are in accordance with National YD/T9251997 Standard.

    The body make use of cold rolling steel sheet Strong adhesive force, artistic and durable.

    Distinctive design of 1-2 cable entrance and fiber exit of 1-24 cores assures flexibility.

    Cable entrance are sealed with oil resistance NBR to increase the flexibility. Users can choose to prick the entrance and exit.

    Overlapping fiber-melting tray and separate insulation earth unit make the disposition of the cores, expanding the capacity and cable-earthen flexible, convenient and safe.

    IIIMain technical Specifications

    External Size: (length×width×height) 430x250x1U/2U/4U

    Weight:3.5kg

    optical fiber winding radius: ≥40mm

    extra loss of fiber traynone

    fiber length left in tray:≥1.6m

    fiber capacity: 24/48/96cores

    working temperature: - 400C ~ + 600C

    lateral pressure-resistance: 500N

    shock-resistance750N

    IVOperations

    Peel the cable , take off the outer and inner housing, as well as loose contract tube, and wash off the filling grease, leaving 1.11.6m  fiber and 2040mm steel core.

    Fix the cable-pressing card and the cable, as well as the cable reinforce steel core.

    Lead the fiber into the melting and connecting tray, fix heat contract tube and melted tube to one of the connecting fiber. After melting and connecting the fiber, move heat contract tube and melted tube and fix the stainless (or quartz) reinforce core stick ,make sure the connecting point is in the middle of the housing pipe. Heat the pipe to make the two into one.Put the protected joint into the fiber-laying tray.(one tray can lay 12 cores)

    Lay the left fiber in the melting and connecting tray evenly, and fix the winding fiber with nylon ties. Use the trays from the bottom up. After all the fiber has been connected, cover the top layer and fix it.

    Position it and use the earth wire in accordance with the project plan.

    VPacking List

    terminal case main body: 1 piece

    polishing sand cloth: 1 pcs

    melting and connecting mark: 1 pcs

    heat shrinkable sleeve: 224 pcs

    tie: 424 pcs



    公司名片
  • 联系人:姜先生
  • 所在地:浙江省宁波市慈溪市
  • 地址:浙江 宁波 慈溪市 掌起镇巴里新区3栋12号
  • 身份认证:
  • 电话咨询 137****4611